Credit: Scott Sturkol | Date Taken: 05/14/2020
This video shows employees with the Fort McCoy Logistics Readiness Center (LRC) rail operations team moving rail cars loaded with Army equipment May 14, 2020, at Fort McCoy, Wis. Equipment and vehicles belonging to the Army Reserve’s 996th Engineer Company and 327th Engineer Company were loaded for rail shipment in March 2020 in preparation for an upcoming deployment. Soldiers from the units completed the rail loading with support from the Fort McCoy LRC. Approximately 245 pieces of cargo were loaded on to 97 rail cars equaling 22.4 short tons. There were zero rail safety accidents with the effort as well. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
- Fort McCoy Rail Movement II ( Download)
- Army locomotives at Fort McCoy key to success of first rail movement at installation in 2023 ( Download)
- 32nd IBCT Gets Support from Fort McCoy Rail Ops Team for 2nd Movement ( Download)
- Fort McCoy: Dynamic Rail Movement for the Infantry Brigade ( Download)
- Fort McCoy Rail Movement III ( Download)
- Fort McCoy Rail Movement I ( Download)
- Members of the Fort McCoy rail operations team move railcars ( Download)
- Fort McCoy Rail Car Loading and tie down - 2000 ( Download)
- YES, The U.S. Army has Trains! (Fort McCoy Rail Operations) ( Download)
- FORT MCCOY RAIL OPERATIONS TEAM SUPPORTS SCOND RAIL MOVEMENT FOR 2024 SUPPORTS 32ND #america ( Download)
- Rail Loading of Army Vehicles, Equipment at Fort McCoy (2019) 🇺🇸 ( Download)
- Behind the Triad Episode 20: Locomotives of Fort McCoy ( Download)
- Discussing CSTX 2022 at Fort McCoy ( Download)
- Army Reservist train all week at Fort McCoy ( Download)
- CP Fort McCoy ( Download)